Live trackers

SEG Rate Tracker

Not a government service. UKSolars is an independent company. It is not affiliated with, endorsed by or acting on behalf of the UK Government, DESNZ, Ofgem, MCS or any local authority. We do not administer any grant scheme, we cannot approve an application, and we never charge for anything a government provides free.

How we are paid. We are paid a fee by installers when we introduce a homeowner who asks for a quote. It does not change your price, and we are not paid more by one installer than another for the same job. In full.

Short answer

A monthly-verified record of every UK Smart Export Guarantee tariff, separating the four variables that make published "best rates" incomparable: tied versus untied, flat versus time-of-use, open versus closed to new customers, and whether the headline rate needs a battery. Free to reuse with attribution.

Cadence
Monthly
Verification
Per row, dated
Source
Supplier tariff pages
Licence
CC BY 4.0
Sources checked 2026-09-02 Smart Export Guarantee obligation: checked 2026-08-23

Every month, each row in this table is re-read from the supplier’s own published tariff page and stamped with the date it was read. Rows that have not been re-read say so, in place, rather than being presented as current.

The row-level date shows exactly which rates were checked.

Download the 1 September 2026 CSV. It contains the rate, tariff type, tie status, battery condition, verification date, notes and primary-source URL for every published row.

Why this dataset exists

At the time of research, pages ranking in the top ten for “best SEG rate” gave the answer as 12p, 15p, 15.1p, 16.5p, 24p, 25p, 27p and 32.17p.

None of them was lying. They were conflating four independent variables:

  1. Tied or untied: is the rate conditional on buying your import electricity from the same supplier?
  2. Flat or time-of-use: a 32p peak applies for a few evening hours; solar exports at midday.
  3. Open or closed to new customers: several headline tariffs closed in March 2026 and are still quoted.
  4. Battery required: some rates are only reachable with £4,000 to £8,000 of storage.

Collapse those four into one number and you get eight different answers to the same question. Keep them apart and the question becomes answerable.

Methodology

  • Source: each supplier’s own published tariff page. Comparison sites are never used.
  • Cadence: every row re-read monthly.
  • Dating: per row, not per page. An unverified row displays as unverified.
  • Null over guess: where a rate cannot be confirmed, the cell is empty rather than carrying a figure over from elsewhere.
  • Change history: appended, never rewritten.

Current verification state

All published rows were checked against the supplier’s own public tariff page on 1 September 2026. The table and downloadable CSV carry that date per row. Tariffs not displaying a reproducible numerical rate on a public supplier page are omitted rather than estimated.

Reuse

Free to use with attribution

This dataset is published under a Creative Commons BY 4.0 licence. Use the figures, republish the table, quote it in an article: credit UKSolars and link to this page.

Journalists: if you need a cut we have not published: rates over time, a specific supplier’s history, tied versus untied spread: ask rather than estimating it. We would rather produce it than have it reverse-engineered wrongly.

What changed, and when

The change history for this dataset lives alongside the wider funding changelog on the funding tracker, because export rates and grant schemes move for related reasons and readers rarely want one without the other.

  • 1 September 2026: full supplier-page verification pass. Replaced stale E.ON, British Gas and Good Energy figures; added tied and untied options as separate rows; removed unsupported claims about tariff closure.

The fields, defined

| Field | What it means | | --- | --- | | Supplier | The SEG licensee | | Tariff | The named export tariff | | Rate | Pence per kWh as published. Empty where unconfirmed | | Type | Flat, or time-of-use | | Tied to import? | Whether you must also take import supply from them | | Open to new? | Whether a new customer can join today | | Battery needed? | Whether the headline rate requires storage to reach | | Last verified | The date this row was read from the supplier’s own page |

The last column is the one that makes the rest of it worth anything.

What each supplier pays for exported solar

SupplierTariffRate TypeTied to import? Open to new?Battery needed? Last verified
Good Energy Solar Savings Exclusive
Fixed for 12 months. Requires solar panels and a battery installed by Good Energy, plus Good Energy import supply.
25p Flat Tied Open Yes 2026-09-01
EDF Export Exclusive 12m V3
Fixed for 12 months. For eligible residential customers buying a new solar or battery system through EDF/Contact Solar after 2 March 2026; EDF import supply required.
18p Flat Tied Open No 2026-09-01
Octopus Energy Prime Outgoing
Pays 16p/kWh from 4pm to 7pm and 9p/kWh at other times. Designed for compatible battery customers; check current eligibility before switching.
9p
peak 16p
Time of use Tied Open Yes 2026-09-01
ScottishPower SmartGen Premium Plus
Requires ScottishPower import supply and an eligible solar or battery installation bought through ScottishPower.
15p Flat Tied Open No 2026-09-01
E.ON Next Next Export Exclusive v3
Fixed for 12 months. Requires an eligible E.ON Next import tariff; time-of-use import tariffs are excluded. Residential systems up to 15kW.
13p Flat Tied Open No 2026-09-01
EDF Export 12m V2
Fixed for 12 months for eligible existing EDF residential electricity customers.
13p Flat Tied Open No 2026-09-01
Octopus Energy Outgoing Octopus
Flat variable export rate for Octopus import customers.
12p Flat Tied Open No 2026-09-01
British Gas Export Premium
Variable. Requires British Gas electricity supply; published for systems up to 15kW.
12p Flat Tied Open No 2026-09-01
Good Energy Solar Savings
Variable. Requires Good Energy electricity supply.
12p Flat Tied Open No 2026-09-01
ScottishPower SmartGen Premium
Requires ScottishPower import supply.
12p Flat Tied Open No 2026-09-01
E.ON Next Next Flex Export
Variable export tariff. E.ON Next import supply is not required.
6p Flat Untied Open No 2026-09-01
ScottishPower SmartGen
Available without moving import supply to ScottishPower.
6p Flat Untied Open No 2026-09-01
EDF SEG Export Variable Value
Variable rate for eligible existing EDF electricity customers.
5.6p Flat Tied Open No 2026-09-01
Octopus Energy SEG tariff
Standalone SEG option for eligible generators whose import supply is with another supplier.
4.1p Flat Untied Open No 2026-09-01
British Gas Export SEG
Variable standalone export tariff for customers whose import supply is elsewhere.
3p Flat Untied Open No 2026-09-01
EDF SEG Export Variable
Variable standalone tariff; EDF import supply is not required.
3p Flat Untied Open No 2026-09-01

Every row is re-read from the supplier’s own tariff page monthly. Compare the untied column before the rate: a higher tied export rate can still lose once the import tariff is counted.

Common questions

Can I republish this table?
Yes. Everything here is free to use under a Creative Commons BY 4.0 licence: credit UKSolars and link to this page. If you need a cut we have not published, ask rather than estimating it.
Why is the verification date per row rather than per page?
A page-level update date does not show which tariffs were checked. A date on each row makes the scope of the review clear.
Why not use comparison sites as a source?
Because they are the problem this tracker exists to fix. Comparison pages routinely quote closed tariffs, mix time-of-use peaks with flat rates, and omit whether a rate is tied. Every row here comes from the supplier's own published tariff page.
What counts as a change worth logging?
Any change to the rate, the tie status, availability to new customers, or the battery requirement. Each entry records what changed, on what date, and where it was read.

Sources

Checked 2026-09-02. Rates, rules and eligibility can change. Confirm current terms before signing a contract or applying for funding.

Get important solar updates

One email when a grant, export rate or rule changes. No newsletters or sales emails.

Email me when a grant, export rate or rule on this site changes. Nothing else, and my address is never passed to anyone. We never sell your email or pass it to an installer. Unsubscribe at any time.