Not a government service. UKSolars is an independent company. It is not affiliated with, endorsed by or acting on behalf of the UK Government, DESNZ, Ofgem, MCS or any local authority. We do not administer any grant scheme, we cannot approve an application, and we never charge for anything a government provides free.

How we are paid. We are paid a fee by installers when we introduce a homeowner who asks for a quote. It does not change your price, and we are not paid more by one installer than another for the same job. In full.

Short answer

Many roof-mounted domestic solar installations are permitted development, but the rules depend on the UK nation, property type, position and local restrictions. England changed its rules on 27 August 2026 and introduced transitional arrangements. Check the current national guidance and your local planning authority before work starts.

England rules changed
27 August 2026
Listed property
Check listed building consent
Leasehold
Check freeholder consent
Local restrictions
Article 4 and planning conditions
Sources checked 2026-09-09 Planning permission for domestic solar: checked 2026-08-23

Planning is property-specific. A neighbour’s installation does not prove yours is permitted, and installer experience does not replace a decision by the planning authority.

Start with the nation and property type

Planning systems differ across England, Scotland, Wales and Northern Ireland. This page gives a screening route, not a legal determination. Use the official guidance for your nation and ask the local planning authority when any exception may apply.

For England, the Planning Portal records revised permitted-development rights from 27 August 2026 and a 12-month transitional period. Conditions cover matters such as visual impact, removal when no longer needed, projection and height. Different provisions can apply to a house and a block of flats.

Ask before proceeding if any of these apply

  • the building is listed or within the grounds of a listed building;
  • the property is in a conservation area, World Heritage Site or other designated land;
  • an Article 4 direction or earlier planning condition removes permitted-development rights;
  • panels would be on a flat roof, wall, balcony or freestanding frame;
  • the system would exceed the stated height or projection limits; or
  • you are a leaseholder or share ownership of the roof.

Planning permission and listed building consent are different

A proposal may need one, both or neither. For a listed property, ask the conservation or planning team before agreeing the design or paying for installation.

Keep the answer in writing

If the position is uncertain, ask the planning authority whether an application, prior approval or lawful-development certificate is appropriate. Keep the drawings and written response with your property documents; they may be useful when selling.

Also check Building Regulations, roof loading, electrical compliance and network-connection requirements. Planning permission does not approve those separate matters.

Common questions

Do solar panels normally need planning permission in England?
Many roof-mounted domestic installations can be permitted development if every relevant condition and limit is met. England changed these rights on 27 August 2026 and added a transitional period, so use the current Planning Portal guidance for the proposed design.
Can I install solar panels on a listed building?
Do not assume permitted development applies. Work affecting a listed building may require listed building consent and may also need planning permission. Speak to the local planning authority before commissioning the installation.
Do flats have different solar planning rules?
Yes. Property type and the position of the equipment affect the applicable limits, and leasehold or shared ownership adds separate consent questions. Check the current national rules and obtain permission from the relevant owner or management body.

Sources

Checked 2026-09-09. Rates, rules and eligibility can change. Confirm current terms before signing a contract or applying for funding.

Work out the number before anyone quotes you

Every assumption editable, nothing sent anywhere, no email. It will not give you a quote, but it will tell you whether one is fair.

Open the calculator

We are not taking quote requests yet

We will not collect your details until we can name the installers who would receive them, so there is no form here to fill in. What we can do is tell you when something changes: a scheme opening, an export rate moving, or the quote form going live.

Email me when a grant, export rate or rule on this site changes. Nothing else, and my address is never passed to anyone. We never sell your email or pass it to an installer. Unsubscribe at any time.